Asha Sikshan Sansthan

Updates and Budget proposal (July 2005)

 

 

School building details:

 

Total Area: 1/6th acre

 

Building: 20 ft width, 52 ft long, 9 to 12 ft height

 

Supported by pipes, tin sheds on the top, has benches and chairs

 

Problem: Have to move benches and chairs when rains or sun, gets disturbed. School is open, so security is a problem.

 

 

(All amounts are in Indian rupees)

 

Budget for school building

 

15000 bricks

22500

6 doors

12000

15 bags cement

2250

1 trolley sand

1700

6 frames for doors

2100

12 windows

12000

Labor charges

6000

TOTAL

58550

 

 

Budget for lavatory tank and room

 

10x6x9 tank digging

600

Bricks 3000

4500

Sand 1 trolley

1700

Cement 20 bags

3000

Small stones 60 tins

1200

Steel bars 50 kg

1300

Pipes (4in and 3 in) 25 ft

550

1 labor for leveling land

50

Bricks 2000

3000

Cement 12 bags

2000

Sand ½ trolley

900

Small stones 20 tins

400

Labor charges

6200

Lavatory seat

500

TOTAL

25900

 

 

Bathroom (4x6x7 ft)

 

Bricks 1200

1800

Cement 10 bags

1500

Small stones 20 tins

400

Sand ½ trolley

900

Labor

1000

TOTAL

5600

 

 

Urinal (4x6x7 ft)

 

Bricks 1200

1800

Cement 10 bags

1500

Small stones 20 tins

400

Sand ½ trolley

900

Labor

1000

TOTAL

5600

 

 

Sewing center

 

Sewing machine 1 (heavy)

3500

Interlock

2000

Pico (designs) machines

4000

Sewing machine 2 (small)

5000

Weaving machine

7000

TOTAL

21500

 

 

School boundary wall (total area 5600 sq. ft. or 1/6 acre) --- 6 ft height, 2ft down = 8 ft.

 

Bricks 52000

75000

Sand 2 trucks

10000

Cement 150 bags

22500

Labor

10000

TOTAL

117500

 

 

 

SAC budget from October to June 2006 (9 months)

 

Books and other necessities for 130 students @ 700 p.a.

91000

Tour in spring 2006 for 3 days @ 150 per child

19500

Medicine/physician help in emergency

5000

Playing/recreational material

5000

Maintaining children library

8000

Coordinator honorarium @3000 per month

27000

7 teachers salary @ $1500 per month

94500

 

 

Mid-day meals 5 per day per child (6 days a week) for 45 weeks

175500

 

 

Clothes 600 per year per child (2 pairs) 

78000

 

 

Computer

17500

UPS, printer, stabilizer (2000 + 4800 + 1500)

8300

Camera

6000

TOTAL

535300