Odanadi Seva Samsthe

Madilu - New Residential and Rehabilitation Center

Construction Expenses
(from September 2001 to March 2004)

Posted: June 6, 2004 by Ramesh Dodamani

 

 

 

 

 

 

SL. NO.

PARTICULARS

 

AMOUNT (Rs)

 

 

 

 

1

Labour payment

Both are for construction labor

436,552.00

2

Contractor payment (plastering)

260,700.12

3

Miscellaneous expenses

 

20,169.81

 

(Nails, cowdung, dry gross, sharpening of blades, hammer,hammer handles, pins, wall brush, hare, guddali etc.)

 

 

4

Wood

 

401,767.00

5

Cement godown*

 

174,000.00

6

Engineer salary**

 

84,000.00

(Returned to Odanadi as donation)

 

 

7

Carpenter labour payment

 

74,345.00

8

Fabrication work

 

95,468.10

9

Electricity charges

 

40,449.00

10

Misc Hardware (Chandru paints)

 

75,363.50

11

Steel

 

356,234.05

12

Barbending labour charges

 

63,807.69

13

Electrical items

 

34,247.72

14

Labour payment - Electric work

 

19,250.00

15

Centring materials - rent paid

 

144,845.00

16

PVC pipe

 

2,128.00

17

Plumbing materials

 

45,323.00

18

Plumber labour

 

20,000.00

19

Sanitary items

 

25,399.00

20

Water pipe

 

2,550.00

21

Cinders

 

16,040.00

22

Water tank

 

24,150.00

23

Door fittings

 

1,374.00

24

Watchman

 

7,230.00

25

Paint

 

1,312.00

26

Sheets

 

3,030.00

27

Welding charges

 

4,990.00

28

Architect fee**

 

103,792.40

(Returned to Odanadi as donation)

 

 

29

Godown rent

 

1,860.00

30

Plastic drum - 2 nos.

 

1,326.00

 

 

 

 

 

TOTAL

 

25,41,703.30

 

 

 

MATERIALS USED:

 

 

 

 

 

 

Sl. No.

Particulars

 

 

 

 

 

 

1

Bricks

3,32,521.70

(1.70 each)

2

Cement

6,22,015.00

(Rs. 155 each bag)

3

Boulders

25,600.00

(Rs. 1,600 each load)

4

Sand

2,12,400.00

(Rs.1,800.00 each load)

5

Jally -- 40 mm - 8 load

12,800.00

(Rs.1,600 per load)

6

Jally - 20 mm & 12 mm - 26 load

1,21,550.00

(Rs. 4,675 per load)

6

Size stone -- 25 load + 263 extra

50,000.00

(Rs.2,000 per load)

7

Lime - 270 bags

16,200.00

(Rs. 60 per bag)

8

Clay

1,200.00

 

9

Mangalore Tiles - 8,179

31,489.15

(Rs. 3.85 per each tile)

 

 

 

 

 

Total (construction materials)

14,25,775.70

 

 

 

 

 

 

Total expenses

Rs. 39,67,479.00

 

 

 

 

 